Flashing: Roof/Wall Intersections

Flashing: Roof/Wall Intersections

February 2015

Brick and Block

Figure 1
Figure 1

As the technical services manager of the Brick Industry Association (BIA) in the Southeast region, one facet of my responsibility is to conduct jobsite investigations on both commercial and residential masonry installations when something goes awry.

There is a saying, “The squeaky wheel gets the grease.” Sadly, that is the case, many times, with masonry installations.  It is rare for my presence to be requested on a site where things have gone well.

One of the issues about which I am most often contacted is water penetration into structures where brick veneer intersects with a roof – in areas such as gables, bay windows and chimneys.  Some masons still do not understand that a single wythe of masonry should never be expected to be the sole provider of protection against water penetration. It is to be expected that some water might penetrate brick, or other masonry veneer, during a wind-driven rain event.

This is a non-issue if a water-resistive building wrap and flashings are properly installed, and a relatively clear airspace is provided behind the veneer. Any water that penetrates into the wall assembly is quickly directed back to the outside. Notice how the 2012 edition of the International Residential Code (IRC) addresses what ultimately provides protection against water penetration into a home:

R703.1.1 Water resistance. The exterior wall envelope shall be designed and constructed in a manner that prevents the accumulation of water within the wall assembly by providing a water-resistant barrier behind the exterior veneer as required by Section R703.2 and a means of draining to the exterior water that enters the assembly.  

To collect water that penetrates brick veneer, and to direct it back to the exterior of the wall, Section R703.8 Flashing states, “Approved corrosion-resistant flashing shall be applied shingle-fashion…shall extend to the surface of the exterior wall finish.”

Figure 2
Figure 2

It is easy to see why such flashing is commonly referred to as thru-wall flashing. Thru-wall flashing originates with a vertical leg in contact with the exterior sheathing – tucked or shingled up under the house wrap – and a horizontal leg that extends all the way through the masonry to the exterior surface of the wall.

Most mason contractors are diligently installing flashing and weep holes at the base of walls, as well as at the window head and sill. However, typically in gables, the flashing installed consists of a base flashing and a counter flashing. But flashing that extends through the veneer and weep holes are often omitted. See Photo 1 and Photo 2 – base flashing with counter-flashing caulked where it intersects with the veneer.

The International Residential Code (IRC) does include a detail showing how to support masonry veneer in a gable (see Figure 1), but this detail is very hard to install properly. In order to get through-wall flashing in place using the IRC detail, a series of pans would need to be fabricated and installed as shown in Photo 3 and Photo 4. This involves a high degree of difficulty and possible failure.

The detail that I have developed and used with great success can be seen in Figure 2. This installation utilizes a one-piece flashing that serves as both thru-wall and counter-flashing, and can be made in lengths up to 10 feet with a lightweight metal break (see Photo 5, Photo 6, and Photo 7). This detail has been fully tested in a nationally recognized research center (see Photo 8 and Photo 9).

Photo 1
Photo 1

Photo 2
Photo 2

Photo 3
Photo 3

Photo 4
Photo 4

Photo 5
Photo 5

Photo 6
Photo 6

Photo 7
Photo 7

Photo 8
Photo 8

Photo 9
Photo 9

The following direct quotes from the report detail a portion of the findings:

Introduction

  • The current flashing details in the 2013 International Residential Code (IRC) for sloped roof/wall intersections are very difficult to construct.
     – As a result, most typical construction does not use any type of through-the-wall flashing which results in leaky wall complaints.
  • Test panels constructed using the IRC detail and typical construction practices were built and tested in the lab.
  • Additionally, an alternate flashing detail was evaluated and compared to both the IRC detail and typical construction practices.

The alternate detail, proposed by Bryan Light of the Brick Industry Association (BIA) – Southeast Region, was found to provide equivalent performance to the IRC flashing detail while being much easier to construct.

Observations from testing

  • Both the IRC and BIA-Southeast Region flashing details resisted moisture penetration.
  • The typical construction practice test panel allowed water to penetrate between the roof/wall interface.
  • The amount of water exiting the weeps was nearly identical between the IRC and BIA-Southeast Region details (comparing the 7:12 slopes).
  • More water was absorbed by the brick for the IRC test panel than the BIA-Southeast Region test panel with equivalent slopes.  This probably had to do with the slope of the actual flashing in the wall.

The rate of water exiting the weeps decreased as the slope increased for the BIA-Southeast Region flashing detail test panels.

Summary

  • A direct comparison of test panels with 7:12 roof slopes showed that both the IRC and BIA-Southeast Region test panels offered effective protection against water penetration while the typical construction test panel did not.
  • No water penetration was noted on any of the test panels constructed with the BIA-Southeast Region detail.

The BIA-Southeast Region was much easier to build than the IRC detail and since if offered an equivalent level of protection; it appears to be a viable option to the IRC detail.

The photos and information contained herein can only establish a partial explanation of the BIA detail and the testing that was undertaken. If you have any questions/suggestions, I would welcome your phone calls/email messages in this regard. One thing for sure, if contractors continue to encounter water penetration issues with masonry veneer applications, they will tend to lean toward using some other type of cladding material. That is the very last thing I want to see happen.


Bryan Light is technical services manager for BIA Southeast Region. He can be contacted at 770-846-0728 or blight@bia.org.

h


Case Study
QUIKRETE Helps Southlake to Serve and Protect

New Emergency Response and Training Center Features Intricate Masonry Design

brick--block-sbpx_firehouse3-dsc_2957
In 1997, the City of Southlake, Texas, established the Crime Control and Prevention District (CCPD) as a resource for reducing crime, increasing public safety and improving quality of life for its residents.Recently, CCPD continued its mission by opening the Southlake DPS North Training Facility, a nearly 30,000-square-foot campus that offers emergency response and serves as the training facility for the next generation of police officers and firefighters. Artisan Masonry Inc. used QUIKRETE mortar to deliver waves of contrasting colors and course design befitting this invaluable community asset.Complete with firing range, police and fire departments, medical center, auditorium and classrooms, Southlake DPS North Training Facility has a look created by alternating courses of recessed and protruding bricks of various colors, along with stacked bond arches large enough to accommodate fire engines.In addition, cast stone panels and cast stone cornice were used to accent doors, windows and walls. Artisan Masonry applied nearly 160,000 modular bricks and more than 22,000 concrete masonry units with QUIKRETE Mason Mix Portland Lime Type N (PLN) Mortar in two custom shades of brown and QUIKRETE Mason Mix Portland Lime Type S (PLS) Mortar in gray. The two Southlake DPS North Training Facility signs were sculpted into the building with custom clay brick letters.“This was a very intricate project that required exact precision to get all the beautiful brickwork details right,” says Bobby Gladu, president of Artisan Masonry Inc. “It’s a mason’s dream to build a monumental structure that will stand the test of time like Southlake DPS North Training Facility. We use QUIKRETE on all of our projects because of the consistency of their colors and strengths, which is very important in doing an intricate project of this nature.”

In addition to enhanced productivity and reduced labor costs on the project, the use of a bulk mortar silo system helped minimize construction waste. This helped Southlake DPS Training Facility secure U.S. Green Building Council’s Leadership in Energy & Environment Design (LEED) recognition.

Scroll to Top