In 2009, The University of Maryland maintenance team was faced with campuswide preservation issues. One building in particular, Shoemaker Hall, was in need of a full restoration.

Built in 1932, Shoemaker Hall had fallen prey to general neglect, natural soiling from the elements and unfavorable repair methods.

Solution

After assessing the scope of the project, specific issues were identified as damage from spalling; improper patching and tarring of joints; rust jacking; and previous application of incompatible products. Exposure to the elements spawned dirt and carbon buildup as well as patina staining from copper.

A key point of importance for The University of Maryland was to complete the restoration, but leave the building looking 82 years old. Head of maintenance Butch Boswell and his team researched brands and products for compatibility. A continual issue they encountered was that materials were not compatible with the substrates to which they were applied for repairs. This resulted in failures, damage of original substrates, and spalling.

In moving forward with the restoration, Cathedral Stone products were applied to the entire building. Cleaners included Masonre G (granite, cement), B (limestone), and B+ (multi-purpose heavy duty). As with all Cathedral Stone products, the cleaners are environmentally safe.

During the repair process, all mortars, including pointing mortars, were customized in Cathedral Stone’s onsite lab to match composition and color. Mortars included Jahn M160 (granite, bluestone), Jahn M70 (limestone) and Jahn M110. Jahn M110 is pointing mortar designed to have a lower compressive strength than the surrounding masonry. This quality allows it to absorb the stress of natural expansion, rather than transfer it to surrounding masonry, thereby preventing failures.

No Cathedral Stone mortar contains bonding agents such as latex, acrylic bonding agents or other additives. When repair materials contain these agents, a waterproof barrier forms at the back of the repair. The water and salts that naturally pass through the substrate become trapped.

Freeze/thaw cycles and buildup of salt crystallization begin to push out the repaired area, thus compromising the integrity and, often times, damaging the surrounding substrate. Due to the aforementioned, The University of Maryland has experienced success with Cathedral Stone Products.

“We have used everything in the Cathedral Stone Product line,” says Boswell. “After using the products on over 300 buildings across campus, we are just overwhelmed with success of the outcome. Time and again tested, and time proved.”

With the approach of collaboration between science and masonry, no failures have occurred. The University of Maryland has maintained the integrity of the campus, while reducing costs with a long-lasting solution.



Related Posts

  • 75
    Table of Contents May 2013 Volume 52, Number 5 FEATURES Saws for Masons No matter the task or function in question, the masonry saws industry has researched and developed the perfect saw for the job. Anchoring Stone Veneers When using stone as a veneer, engineering and design are critical factors in a successful building project.…
    Tags: masonry, building, stone, restorations, hall, shoemaker, university, maryland, rehabs, full
  • 38
    Table of Contents May 2012 Volume 51, Number 5 FEATURES Rehabs and Restorations Case Studies Learn from the experiences of others, as we highlight a variety of restorations to several types of structures using a host of materials. Masonry Construction Creates Durability in Four Indiana Schools Updating Design, Materials to Meet Codes and Standards Restoring…
    Tags: masonry, materials, restorations, solution, rehabs, stone, building, full, products
  • 35
    July 2013 Case Study >>> Mortars, Mixtures and Staining Mortars and Compatibility Preventing failures through a unique approach with Cathedral Stone Often, when considering mortars, overlooked factors can lead to a project’s demise. In striving to create a better solution, Cathedral Stone Products has implemented a unique process and outlook for creating high-performance, long-lasting, colorfast…
    Tags: mortars, mortar, stone, masonry, cathedral, products, failures, jahn
  • 31
    February 2014 Case Study >>> Brick and Block University of Oklahoma’s Headington Hall By Patrick Schoenfeldt >>> Project Details Construction Start: May 2011 Construction Completed: June 2013 Construction Manager: Flintco, LLC. Oklahoma City, Okla. Construction Cost: $54 million Masonry Cost: $4.6 million Masonry Contractor: Sun Valley Masonry, Phoenix, Ariz. Brick Manufacturer: Acme Brick Cast Stone…
    Tags: masonry, hall, building, stone, university
  • 31
    Table of Contents September 2008 Volume 47, Number 9 FEATURES Tuckpointing and Repointing Tools To cut, clean and refill a mortar joint with fresh mortar, known as tuckpointing, is part of a standard maintenance package for brick and block buildings. Masonry showcases the equipment used in this large, specialized industry. Clean, Green and Sealed The…
    Tags: mortar, masonry, cleaners, rehabs, building, restoration, restorations, products, full, issues

MASONRY MAGAZINE VIDEO NEWS

Zachary Zuldema 1st Place (2nd Year) Winner Interview at the World of Concrete

Zachary Zuldema 1st Place (2nd Year) Winner Interview at the World of Concrete

Bill Dentinger 2015 Inductee MCAA Hall of Fame

Bill Dentinger 2015 Inductee MCAA Hall of Fame

John Smith, Jr.

John Smith, Jr. receives the 2015 MCAA C. DeWitt Brown Leadman Award

2015 MCAA Fastest Trowel On The Block Winner

2015 MCAA Fastest Trowel On The Block Winner

Daniel Furr 1st Place Winner

Daniel Furr 1st Place Winner (First Year), Masonry Skills Challenge

Synpro Products

Masonry Magazine Video News Interview: Michael Goyne

Hydro Mobile Inc

Interview with Kevin O'Shea of Hydro Mobile, Inc.

Interview with Mark Kemp – Chairman, MCAA

Interview with Masonry Contractors Association of America Chairman, Mark Kemp

Mortar Net Solutions

Interview with Steve Fechino from Mortar Net Solutions

Pullman Ermator

Interview with Lyndon Kelsey of Pullman Ermator

Keene Building Products

Interview with Jim O'Neill of Keene Building Products