Quality Matters

facebooktwittergoogle_plusredditpinterestlinkedinmail

Mixers

Mixers are no longer disposable as mason contractors demand more from manufacturers.

You have heard of disposable cups, forks, plates, diapers and even razors. But, contractors can’t afford to throw away mortar mixers every time they finish a job, nor can they afford the breakdowns or repairs that come with the purchase of a low-quality mixer.

Most contractors realize it is more costly to repair a mortar mixer than it is to pay a little more for a well-built mixer at the time of the purchase. You have heard the saying, “Pay me now, or pay me later.”

It works that way with equipment, too. Consider the cost of an equipment breakdown or the expense of transporting a mixer to a mechanic for repair. Simple math tells us the money saved upon purchase is much less than the long-term expense of owning a low-quality piece of equipment. Because of this, during the last few years, contractors have changed the way they purchase equipment.

Buying decisions now are based less on how low the price is, and more on what the mixer will do for the crew, how long it’ll last, and what the cost of repairs will be during the life of the mixer. For this reason, manufacturers have been forced to improve the way they build mixers. It is much like what Honda has done with the motors that go on your equipment. If contractors see value in the product they are using, they notice and pay for that value. This change in thinking is harder on the parts business for manufacturers, but easier on the mason contractor who needs a dependable mixer to maximize profit.

Just what does it cost if a breakdown occurs?

If a contractor has five bricklayers on the job and his mixer breaks down, the cost to repair the mixer is a fraction of what it costs to have those bricklayers standing around waiting on mortar. In fact, nothing happens on most projects until the mortar is mixed. For that reason, some mixer companies have gone to electric start. Every time a laborer pulls on a cord to start the mixer, he is one step closer to pulling it in half, and shutting the job down. With electric start, the only time he has to pull to start the mixer is to recharge the battery after the key was left on the night before. Therefore, with electric start, the pull cord can actually last for several years.

Equipment quality or breakdowns aren’t always as big a factor. For instance, if you are a residential contractor who only uses a mixer once every couple of weeks, buying a cheaper mixer may be the way for you to go. However, it may serve you better to just rent when you need a mixer if you aren’t using it that often.

Advantages of renting equipment:

  • You’re not responsible for normal breakdowns or most maintenance

  • You have no storage costs

  • Payments stop when you take the machine back

However, renting small pieces of equipment, like mixers, verses large pieces of equipment means you’re dealing with two different animals.

Regarding renting verses buying mixers, a contractor can afford to rent small equipment or tools, such as a mixer, only so many times per year before it becomes cheaper to own. In fact, one rental company owner explained to me that, if you rent a small piece of equipment more than 24 times per year, it is much cheaper to buy it, since much of the cost of that small piece of equipment is incurred when you pay a laborer to pick it up and take it back.

The costs depend on the distance your project is from the rental store and whether the rental company can provide it to you quickly once you arrive to pick it up or drop it off. Our company figures one hour for pick up and one hour to take the piece of equipment back. This includes drive time, counter time and load time. At $40 per hour it costs us $80 (upfront) each time we rent. This cost can be reduced somewhat by calling the rental company ahead of time to insure they have the equipment ready, but the expense still has to be taken into consideration when deciding whether to rent or purchase.

Photo courtesy of  EZ Grout Corp.

Regarding large equipment, the purchase price is much more than the delivery charge so the delivery cost is less important. Plus, if the rental store is closer to the jobsite than your office, it may be cheaper to have the rental company deliver the equipment to the jobsite than it is to pay your driver to pick it up.

Lately, rental rates for large equipment have dropped so low that it is difficult to justify a large equipment purchase. The rental amount is often much less than your monthly payment would be from a purchase. In the past, the monthly payment on a piece of purchased equipment was less than a monthly rental rate. Today, you can often rent for one-third to one-half of the payment on a piece of new equipment.

The golden rule we use is this: If the large piece of equipment will be used more than 75 percent of the time, it is cheaper to purchase than rent. However, in today’s market, another variable must be added to this dollar cost calculation. You must have a back log of work for the machine for at least one-half the time it will take to pay it off or a minimum of one year if you are paying cash.

Convenience can be a major advantage of owning your equipment. Once you pay the machine off (if the machine outlasts the payment) you get to use it for free. That brings me back to the point: The machine must still be durable enough that it is not breaking down all the time.

Times have changed. We have to look at things differently than we did even a few years ago. Manufacturers have to pay closer attention to what the customer needs. The customer has to pay closer attention to what actual costs are in choosing a disposable versus a high-quality piece of equipment. And, when deciding to buy or rent a piece of equipment, a contractor must do his homework upfront and consider what is most economical for his company. If he decides to purchase, he must consider that only 30 percent of the cost of a piece of equipment is incurred the day it is purchased, while 70 percent is incurred everyday during use. If the right equipment decisions are made upfront, a contractor can save a lot of headaches and money in the end.


Related Posts

  • 59
    March 2012 Mixers, Pumps and Delivery Systems Considerations When Purchasing a Mixer By Damian Lang Like cars, trucks, tractors and cranes, mixers are not what they used to be. Some are built on price, some on ergonomics, and some on quality. Mason contractors face the same issues day in and…
    Tags: mixers, mixer, time, equipment
  • 57
    June 2013 Rentals Realizing the Benefits of Equipment Rental By Tom Hubbell Rental: the diesel-powered Brokk 400 from Brokk AB delivers durability in application where electricity is difficult to access. The system allows the operator to control the machine with quick, precise movements. www.brokk.com Equipment rental revenues continued to outpace…
    Tags: equipment, rental
  • 54
    August 2011 Rentals The Case for Renting Equipment Courtesy of Hydro Mobile By Wayne Walley In today’s challenging economy, the reasons for contractors and construction companies to rent equipment versus purchasing are magnified. “What rental offers contractors and construction companies is a cost-effective alternative to owning equipment, because equipment becomes…
    Tags: equipment, rental
  • 48
    June 2012 Moisture Management To Rent, or Not to Rent? By Eudes Defoe Now that the busy season is upon us, contractors nationwide are rolling out their fleets and dusting off their tools and equipment for what hopefully will be another profitable summer. But, if they are like any of…
    Tags: equipment, rent, rental, piece
  • 38
    March 2015 Which mixer is right for your crew on your jobsite? Here’s a place to start. By Jennifer Morrell Most mason contractors will tell you that once they find a mixer, pump and/or delivery system with which they are comfortable and happy, then chances are, they’ll be loyal to…
    Tags: mixer, equipment

MASONRY MAGAZINE VIDEO NEWS

Zachary Zuldema 1st Place (2nd Year) Winner Interview at the World of Concrete

Zachary Zuldema 1st Place (2nd Year) Winner Interview at the World of Concrete

Bill Dentinger 2015 Inductee MCAA Hall of Fame

Bill Dentinger 2015 Inductee MCAA Hall of Fame

John Smith, Jr.

John Smith, Jr. receives the 2015 MCAA C. DeWitt Brown Leadman Award

2015 MCAA Fastest Trowel On The Block Winner

2015 MCAA Fastest Trowel On The Block Winner

Daniel Furr 1st Place Winner

Daniel Furr 1st Place Winner (First Year), Masonry Skills Challenge

Synpro Products

Masonry Magazine Video News Interview: Michael Goyne

Hydro Mobile Inc

Interview with Kevin O'Shea of Hydro Mobile, Inc.

Interview with Mark Kemp – Chairman, MCAA

Interview with Masonry Contractors Association of America Chairman, Mark Kemp

Mortar Net Solutions

Interview with Steve Fechino from Mortar Net Solutions

Pullman Ermator

Interview with Lyndon Kelsey of Pullman Ermator

Keene Building Products

Interview with Jim O'Neill of Keene Building Products